    CANALISATION AND FOOTPATH AT VALIRA RIVER

CANALISATION AND FOOTPATH AT VALIRA RIVER
Andorra la Vella

T.P. UNITAS S.A.U.

The work includes the partial demolition of the existing masonry wall between the riverbed, the Lycée Comte de Foix school and the Joan Alay sports pavilion, the construction of a set of walls forming steps inside the school grounds that act as a buttress to the pre-slabs that make up the river path, and the installation of a 270.00ml sound shield and a protective handrail on these walls.

There is a RECKLI finish on the outer wall and the colours of the Andorran flag adorn the inner wall.   

The work was planned to be carried out over two summers, but Treballs Públics Unitas presented an alternative plan to complete it in the summer and autumn, with no break.

  • GRUP HERACLES

  • Av. Consell de la Terra 14-16
  •    AD700 Escaldes-Engordany
  •    Principat d'Andorra
  • +376 805 600

CONTACT FORM

Informació sobre el tractament de dades: LQPD 29/2021 i RGPD (UE) 2016/679 Responsable del tractament: GRUP HERACLES, S.A. - Finalitat: Oferir, prestar i facturar els nostres serveis i productes. - Legitimació: Consentiment de l’interessat. - Destinataris: Les dades no se cediran a tercers, llevat que ho exigeixi la Llei o sigui necessari per complir amb la finalitat del tractament. - Drets: Pot accedir, rectificar i suprimir dades, així com la resta de mesures que s’expliquen en la nostre Política de Privacitat i Protecció de Dades. - Més informació a la nostra Política de Privacitat i Protecció de Dades. Identificació del nostre DPD: Berta Faura - protecciodades@grupheracles.com