Work consists of excavation of a 50x50m2 plot, down to 15m below street level, and stabilising the perimeter with jet grouting columns and cable anchoring.
The 37,500m3 of excavated material is to be reused for the environmental restoration of stone quarries and to manufacture aggregates.