Construction of a section of bypass at Sant Julià de Lòria (Andorra), including the Tàpia Tunnel, an open section and a bridge, as well as underground service infrastructure.
The tunnel was excavated electronically detonated explosives and seismographic control. The infrastructure includes an emergency gallery and false tunnels at both ends.