• Grup Heracles

    WIDENING AND RECTIFICATION OF THE CG2, PHASE 5

Widening and rectification of the CG2, phase 5
Encamp (Andorra)

T.P. UNITAS S.A.U.

Construction of two parallel false tunnels between the Valira Nova housing estate and the junction of the bypass at Encamp (Andorra), built from prefabricated concrete.

The project includes earthworks and the construction of a buttressed wall anchored by reinforced concrete, the interior facilities, the infrastructure for the main public services and the work of replanting and improving the visual impact.

  • GRUP HERACLES

  • Av. Consell de la Terra 14-16
  •    AD700 Escaldes-Engordany
  •    Principat d'Andorra
  • +376 805 600

CONTACT FORM

Informació sobre el tractament de dades: LQPD 29/2021 i RGPD (UE) 2016/679 Responsable del tractament: GRUP HERACLES, S.A. - Finalitat: Oferir, prestar i facturar els nostres serveis i productes. - Legitimació: Consentiment de l’interessat. - Destinataris: Les dades no se cediran a tercers, llevat que ho exigeixi la Llei o sigui necessari per complir amb la finalitat del tractament. - Drets: Pot accedir, rectificar i suprimir dades, així com la resta de mesures que s’expliquen en la nostre Política de Privacitat i Protecció de Dades. - Més informació a la nostra Política de Privacitat i Protecció de Dades. Identificació del nostre DPD: Berta Faura - protecciodades@grupheracles.com