• Grup Heracles

    WEST MOUTH ACCESS TO THE DOS VALIRES TUNNEL

West Mouth Access to the Dos Valires Tunnel
La Massana i Encamp (Andorra)

T.P. UNITAS S.A.U.

A 3-kilometre tunnel linking the villages of La Massana and Encamp (Andorra).

Post-tensioned concrete work, a reference in its field, consisting of a set of six structures that support each other, with foundations provided by 1.5-metre-diameter piles of varying length. Main features include two cable-stayed bridges with a central tower 47.5 metres high.

  • GRUP HERACLES

  • Av. Consell de la Terra 14-16
  •    AD700 Escaldes-Engordany
  •    Principat d'Andorra
  • +376 805 600

CONTACT FORM

Informació sobre el tractament de dades: LQPD 29/2021 i RGPD (UE) 2016/679 Responsable del tractament: GRUP HERACLES, S.A. - Finalitat: Oferir, prestar i facturar els nostres serveis i productes. - Legitimació: Consentiment de l’interessat. - Destinataris: Les dades no se cediran a tercers, llevat que ho exigeixi la Llei o sigui necessari per complir amb la finalitat del tractament. - Drets: Pot accedir, rectificar i suprimir dades, així com la resta de mesures que s’expliquen en la nostre Política de Privacitat i Protecció de Dades. - Més informació a la nostra Política de Privacitat i Protecció de Dades. Identificació del nostre DPD: Berta Faura - protecciodades@grupheracles.com