Construction of three high-quality industrial warehouses in Prat de la Bartra, Encamp: a unique urban site.
The work involved excavating 5,000m3 of earth, laying foundations using cyclopean concrete, creating long-span beams of post-tensed concrete and building a reinforced concrete frame on the ground floor and a metal frame on the upper floors. The envelope is made of a combination of granite veneer and sandwich panels.
The excavated material has been reused for the environmental restoration of stone quarries and to manufacture aggregates.
This project was carried out in collaboration with another company.